Kitchen Remodels

Kitchen Remodeling

Full kitchen remodels in Eugene and Lane County, done for a fraction of what a gut renovation costs and finished in a fraction of the time.

kitchen remodeling in a Eugene, OR kitchen
Why Choose Us

Why Homeowners Choose Us for a Full Remodel

Designed before it is ordered

You see the kitchen in 3D first, with the real cabinet runs and the real clearances. Changing a layout on a rendering is free. Changing it after the cabinets arrive is not.

One company, every trade

Demolition, cabinets, counters, tile, plumbing, electrical and lighting are all managed by us. You are not scheduling four contractors around each other.

A remodel, not a gut job

We keep solid boxes, sound plumbing and working circuits where we can. That is the difference between a kitchen that costs a fraction of a gut renovation and one that does not.

Permits and inspections handled

If the job moves plumbing, adds circuits or takes out a wall, we pull the permit and schedule the inspection. Code compliance is our problem, not yours.

What a full remodel covers

Layout changes, including removing a wall to the dining room
New cabinetry, or refacing the boxes worth keeping
Countertops, sink, faucet and backsplash
Plumbing and electrical moved to suit the new layout
Recessed, under-cabinet and pendant lighting
Flooring, trim and paint to finish the room

What it usually costs you in time

One to two weeks from first visit to a signed scope and 3D design
Lead time on cabinets and stone, which we order early
Three to six weeks on site once materials arrive
A defined stretch without a sink and range, dated up front
A final walkthrough where we list and fix the punch items
Our Process

How a Remodel Runs

01

Free in-home visit

We measure the kitchen, look at what is behind it, and talk through what is not working about the layout you have.

02

3D design and itemized bid

You get a rendering of the finished kitchen and a quote broken out by cabinets, counters, tile, labor and permits.

03

Selections and ordering

Door style, finish, counter material and hardware get picked, then ordered. Nothing starts on site until materials are in.

04

Build

Demolition, then rough plumbing and electrical, then cabinets, counters, tile and finish work, on a milestone schedule you have in writing.

05

Walkthrough

We walk the kitchen with you, list anything that is not right and come back to fix it.

Ready to talk about your kitchen remodels project?

Consultations and estimates are free. Call Converted Kitchen or send a message and we will get back to you.